Oceania

Dive into the ocean with us

Oceania video

Oceania gallery

SET-UP / DOWNCAST

  • SET-UP: 2 hours.
  • DOWNCAST: 90 minutes.

Elements

  • 6 giant inflatable elements.
  • 4 motorised floats.
  • 1 zero-turn vehicle.
  • 3,500 W sound system and transmitter/receiver system.
  • Costumes, props and make-up.

Staff

  • A suitable venue for setting up and dismantling the show.
  • WE ARE SELF-SUFFICIENT IN TERMS OF DRESSING ROOMS AND ELECTRICAL POWER.

Requirements

  • Lieu adapté au montage et au démontage du spectacle.
  • NOUS SOMMES AUTONOMES EN MATIÈRE DE LOGES ET D’ALIMENTATION ÉLECTRIQUE.