
ASSEMBLY: 2 hours - DISSASEMBLY: 90 minutes.
ELEMENTS:
- 5 giants inflatables elements and 5 engine-run wagons.
- Smoke and laser machine.
- Sound System: 3,500 W.
- Surround sound equipment.
- Costumes, props and makeup.
STAFF:
- 5 drivers for the wagons.
- 5 extras (Metal Warriors).
- 2 Coordinators.
NEEDS:
- Adecuate place for assembly and dissasembly of the parade.
- WE ORGANISE OURSELVES FOR DRESSING ROOMS AND ELECTRICAL POWER.
+ information